We are now 60 days away from opening our doors!

  • All of the exterior glass has been installed including the Feature Wall on the showroom
  • The hail nets have been installed behind the building
  • Concrete is being filled in around the building
  • All interior walls have been textured and painted
  • Tile has started inside.  The is over 1 acre of tile to be laid!
  • Woodwork has started along with all finish out